Skip to main content

Explore the mine

Aerial View of the Antas North Mine
At full scale, the mine will be 650 metres in length, 350 across and 250 meters deep
The current mining plan is to operate over 3 stages to maintain a consistent supply of ore over the life-of-mine
Orebody oriented northeast with mineralisation concentrated within steeply dipping body, containing massive breccia and disseminated copper sulphides
Conventional mining method: drill, blast, load and haul
Competent host rock allow efficient pit design with 80° pit wall and 10-20 metre benches
Efficient site design with waste stockpiled in single location in 10 metre high benches nearby blending into the natural landform